30% OFF - Get Your Quote Today
Mile End Bathroom Fitters and Bathroom Renovations
Mile End’s student flats and period terraces require bathroom fitters who deliver both efficiency and style. Step‑Ahead Bathrooms provides end‑to‑end bathroom supply & fit services in Mile End—managing design, installation, and final handover. We begin with a site survey—measuring alcoves, mapping existing pipework, and assessing natural light—to create 3D renders showcasing frameless showers, wall‑hung basins, and recessed LED niches.
After you approve our transparent, fixed‑price Schedule of Works, we run a Pre‑Start Check 48 hours before work begins, confirming delivery of premium materials (large‑format porcelain, GROHE fixtures, underfloor heating), planning permissions, and neighbour notifications. Under our 4‑Point Control System, daily logs track waterproofing, first‑fix plumbing and electrics, tile dry‑runs, grout sealing, and finish carpentry. You receive secure photo updates via your client portal.
Upon completion, you join us and an independent QC inspector for a 360° final sign‑off. Only once you’re fully satisfied do we activate your two‑year workmanship warranty. For hassle‑free, design‑led new bathroom installations in Mile End, trust Step‑Ahead Bathrooms.
E3 4SN · E3 4SS · E3 4ST · E3 4SU · E3 4SY · E3 4TB · E3 4TD · E3 4UF · E3 4UG · E3 4UX


Mile End Bathroom Fitters and Bathroom Renovations
Modern Luxury Bathrooms Installed in 2 Weeks
Contracts and 2 Years Warranty
No long waiting times 2 weeks from booking
Mile End
London's Highest-Rated Bathroom Builders - 5-Star On All Platforms
Why Choose Us
Rigorously Vetted Craftsmanship
Every fitter on our team has 10 + years' trade experience and must pass a practical skills test - tiling accuracy, pipe-solder integrity and watertight tanking - before we hire them. That means your project is handled only by proven specialists who deliver flawless finishes, first time.
99.7 % Customer Happiness - Backed by Real Reviews
With transparent quotes, fixed timelines and daily progress updates, we keep you in control from survey to sign-off. Independent platforms show nearly perfect scores because we treat your home like our own - and we're not satisfied until you are.
24/7 After-Care & Extended Warranty
Need advice at midnight or help years down the line? Our dedicated support line answers within 10 minutes, any day of the year. Plus, every installation includes a 2-year workmanship warranty and optional service checks to keep your new bathroom performing flawlessly.
.jpg)
Central London
We gutted and rebuilt a dated bathroom - levelling floors, waterproofing, rerouting services, and adding large-format tiles, floating fixtures, and modern lighting

Peckham
We transformed a cramped, uneven Peckham bathroom into a sleek, light-filled retreat with leveled surfaces, re-engineered plumbing, floating fixtures, and reflective finishes that visually double the space.
How Much Does A Bathroom Renovation Cost in Mile End?
2025 UK Bathroom-Renovation Price Guide
Layout/Size-1 | Typical spec | Nationwide 2025 cost | London 2025 cost | Key cost driver |
|---|---|---|---|---|
Cloakroom / WC (≤2 m²) | New WC & vanity, splash-back tiles, vinyl/LVT floor | £1,500 – £3,000 | £2,000 – £4,000 | Set‑up & labour overhead on small footprint |
Small Ensuite (≈3 m²) | Shower enclosure, basin, towel rail, 50% tiled walls | £3,000 – £6,500 | £4,500 – £7,500 | Tile choice & ventilation upgrades |
Standard Family (4–5 m²) | Bath‑shower combo, floating vanity, full-height tiling | £6,500 – £10,000 | £7,500 – £13,000 | Re‑routing pipework & electrics |
Master / Wet Room (6–8 m²) | Walk‑in wet zone, dual basins, under‑floor heating | £10,000 – £15,800 | £12,000 – £18,000 | Tanking, glass screens, larger tile area |
Luxury Spa Suite (8 m²+) | Freestanding tub, stone slab tiles, smart controls | £15,000 – £25,000+ | £18,000 – £30,000+ | Premium fixtures & bespoke joinery |

Does New Bathroom Increases The Value Of The Property ?
2025 UK Bathroom-Renovation Guide
Project scope | Typical spend (London) | Avg. value uplift | £ gain on £500k home | ROI multiplier |
|---|---|---|---|---|
Cosmetic refresh (tiles, taps) | £3,000 – £5,000 | 1 – 2 % | £5,000 – £10,000 | 2.0 × |
Full replacement, same layout | £8,000 – £12,000 | 3 – 4 % | £15,000 – £20,000 | 1.7 × |
Designer upgrade, new electrics | £12,000 – £18,000 | 4 – 5 % | £20,000 – £25,000 | 1.5 × |
Add second bathroom / ensuite | £7,000 – £14,000 | 5 – 6 % | £25,000 – £30,000 | 2.0 × |

We Listen, We are reliable, We are easy to reach, We can do the work with ease!
Mile End - Lets do your bathroom! Get a quote.
Best Bathroom Fitters In London:
www.stepahead-renovations.com
Your New Bathroom in Mile End Is One Click Away
Need a reliable bathroom-renovation team in Mile End? Start with our fixed-price supply-and-fit package.
Best Bathroom Fitters In London:
www.stepahead-renovations.com
Mile End
Explore Our Blog






















.png)














