top of page
brandmark-design (4).png
brandmark-design (4).png

Bathroom Renovation Quote

Customer Name: Guildford Cathedral

Project Address: Stag Hill, Guildford GU2 7UP

Quote Date: Thu Jan 08 2026 14:00:27 GMT+0000 (Coordinated Universal Time)

Quote Reference: 46

1. Labour Work

This section outlines all labour included in your bathroom renovation. It covers demolition, plumbing alterations, carpentry, electrics, waterproofing, tiling, installation of fixtures, and final finishing works.

 

Demolition:

- Removal of existing tiles - Removal of current fixtures (sink, toilet, etc.)

 

Plumbing: Speed Fit and Solvent Weld

- Re-plumbing of the waste pipe where necessary to allow for the new layout. - Re-plumbing of the hot and cold water to allow for the new layout.

- Re-plumbing of the radiator pipes to allow for the new layout.

 

Electrical:

- Re-doing of all conduits and electircals.

 

Carpentry & Drylining:

- Bulding of a new plaster wall to allow for the wall-hung toilet.

- Plastering all walls to allow for the new tiles.

 

Fixtures:

- Installation of a new wall-mounted basin, waste trap and a tap. 440x270mm

- Installation of a new wall-hung toilet and a cistern.

- Installation of all additional items such as handles, dispencers and hand dryinng machine.

- Installation of a mirror.

 

Skimming & Painting:

- Anti-mould, waterproof paint on ceiling and walls.

 

Tiling:

- Tiling of the walls and floor as per 3D design.

Total Labour Price: £1 - Discounted

2. Labour Materials (Estimate)

This section covers materials required to carry out the labour, such as:

plasterboards, fixings, adhesives, grout, levelling compound, waterproofing materials, plywood, sealants, and similar consumables.

Estimated Price: £800

3. Tiling Area / Tiles Needed

We have calculated the total tiling area required for your bathroom based on measurements and the agreed 3D design.

Wall tiling required: 26 m² £598
Floor tiling required: 5 m² £115

 

Tiles Price: £713

4. Fixtures and Fittings

Trade Price: £1521

5. Rubbish Collection (Estimate)

All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.

Estimated Price: £200

Overall Estimate - highly discounted

Labour Work: £1

Building Materials: £800

Tiles Price: £713

Fixtures and Fittings: £1521

Rubbish Collection: £200

TOTAL ESTIMATED PRICE: £3235

3D Designs And Previews

*Rendered 3D visuals will be shared via email for high-resolution viewing. *


Please note that the 3D Desings are for illustration purposes only and are intellectual property of STEP-AHEAD Renovation & Designs LTD

3D Design Walkaround

Warranty & Payment Terms

  • 2-year warranty on all labour work.
  • Payments accepted via card, transfer, or cash.

 

Our Standard Payment Structure:
(Based on the Labour Work Price).

Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.

Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.

Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.

Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.

 

The Payment Structure is based on the Labour Work Price.

 

Prepared by: Ivan Georgiev
Position: Project Manager
Step-Ahead Renovations & Designs

bottom of page