Bathroom Renovation Quote
Customer Name: Jon Stokes
Project Address: 13 Moreton Close, E59EP
Quote Date: Tue Dec 02 2025 21:04:49 GMT+0000 (Coordinated Universal Time)
Quote Reference: 12
1. Labour Work
Demolition:
- Removal of existing tiles
- Removal of current fixtures (sink, bathtub, etc.)
Plumbing: Speed Fit and Solvent Weld
- Re-plumbing of the waste pipe where necessary to allow for the new toilet and vanity unit.
- Re-plumbing of the hot and cold water to allow for the new vanity unit and shower mixer.
Carpentry & Drylining:
- Install floorboards to allow tiling.
- Replacing all damaged plasterboards.(if any).
- Building of a box for the toilet.
- Creation of a new ceiling at 2.4m (standard size).
Electrical:
- Wiring of new ceiling downlights.
Tiling:
- Tiling of the walls and floor as per 3D design
Waterproofing:
- Sealing joints and angles.
- Full waterproofing with tanking kit around the shower area.
Fixtures:
- Installation of a new wall-mounted vanity unit with basin and a tap. 600mm
- Installation of a new bathtub and a screen.
- Installation of a new shower mixer.
- Installation of a new bath filler.
- Installation of a new wall-hung toilet and a cistern.
Skimming & Painting:
- Anti-mould, waterproof paint on ceiling and walls.
Total Labour Price: £5920
2. Labour Materials (Estimate)
Includes plasterboards, adhesives, grout, fixings, plywood, levelling compound, waterproofing materials, etc.
Receipts will be collected and shared at the end of the project for reimbursement.
Total Labour Price: £800
3. Tiling Area / Tiles Needed
- Wall Tiling Needed: 12m2
- Floor Tiling Needed: 5 m².
*As per customer-selected tiles and 3D design layout. *
Tiles to be chosen from customer.
Tiles Price:
4. Fixtures and Fittings
Fixtures and fittings to be supplied by the customer as requested.
Our Proposal:
LINK: https://www.victorianplumbing.co.uk/basket?retrievalCode=JGSML
Code: JGSML
Trade Price
Trade Price: £1590.35
5. Rubbish Collection (Estimate)
All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.
Estimated Price: £200
Overall Estimate
Labour Work: £5920
Building Materials: £800
Tiles Price:
Fixtures and Fittings: £1590.35
Rubbish Collection: £200
TOTAL ESTIMATED PRICE: £8510.35
3D Designs And Previews
*Rendered 3D visuals will be shared via email for high-resolution viewing. *
Please note that the 3D Desings are for illustration purposes only and are intellectual property of STEP-AHEAD Renovation & Designs LTD
3D Design Walkaround
Warranty & Payment Terms
- 2-year warranty on all labour work.
- Payments accepted via card, transfer, or cash.
Our Standard Payment Structure:
(Based on the Labour Work Price).
Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.
Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.
Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.
Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.
The Payment Structure is based on the Labour Work Price.
Prepared by: Ivan Georgiev
Position: Project Manager
Step-Ahead Renovations & Designs
.png)