Bathroom Renovation Quote

Customer Name: Ivanasdasd

Project Address: 128491247

Quote Date: Sat Dec 06 2025 01:12:25 GMT+0000 (Coordinated Universal Time)

Quote Reference: 19

1. Labour Work

Demolition:
- Removal of existing tiles
- Removal of current fixtures (sink, bathtub, etc.)

Plumbing: Speed Fit and Solvent Weld
- Re-plumbing of the waste pipe where necessary to allow for the new layout. As low as possible.

- Re-plumbing of the hot and cold water to allow for the new layout.

Carpentry & Drylining:  
- Install floorboards to allow tiling.

- Replacing all damaged plasterboards.

- Re-doing the box for the toilet and shower tray as low as possible.

- Creation of a new ceiling at lower level.

Electrical:

- Wiring of new ceiling lights downlights.

- Wiring of the new led mirror cabinet.

Tiling:
- Tiling of the walls and floor as per 3D design


Waterproofing:
- Sealing joints and angles.
- Full waterproofing with tanking kit around the shower area.

Fixtures:

- Installation of a new wall-mounted vanity unit with basin and a tap. 600mm

- Installation of a new offset shower tray 1200 x 800 and enclosure.

- Installation of a new shower mixer.

- Installation of a new standard toilet and a cistern.

Skimming & Painting:

- Anti-mould, waterproof paint on ceiling and walls.

Total Labour Price: 123 - Discounted

2. Labour Materials (Estimate)

Includes plasterboards, adhesives, grout, fixings, plywood, levelling compound, waterproofing materials, etc.

Receipts will be collected and shared at the end of the project for reimbursement. 

Estimated Price: 333

3. Tiling Area / Tiles Needed

- Wall Tiling Needed: 19 m2.

- Floor Tiling Needed: 4.5 m².

*As per customer-selected tiles and 3D design layout. *

Tiles Price: 123

4. Fixtures and Fittings

Fixtures and fittings to be supplied by the customer as requested.

Our Proposal: LINK - £1,665.15

Trade Price: 123123

5. Rubbish Collection (Estimate)

All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.

Estimated Price: 123

Overall Estimate - highly discounted

Labour Work: 123

Building Materials: 333

Tiles Price: 123

Fixtures and Fittings: 123123

Rubbish Collection: 123

TOTAL ESTIMATED PRICE: £123825

3D Designs And Previews

*Rendered 3D visuals will be shared via email for high-resolution viewing. *


Please note that the 3D Desings are for illustration purposes only and are intellectual property of STEP-AHEAD Renovation & Designs LTD

3D Design Walkaround

Warranty & Payment Terms

  • 2-year warranty on all labour work.
  • Payments accepted via card, transfer, or cash.

 

Our Standard Payment Structure:
(Based on the Labour Work Price).

Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.

Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.

Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.

Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.

 

The Payment Structure is based on the Labour Work Price.

 

Prepared by: Ivan Georgiev
Position: Project Manager