Customer Name:
Project Address:
Quote Date: Sun Nov 23 2025 20:36:59 GMT+0000 (Coordinated Universal Time)
Quote Reference: 2
1. Labour Work
Demolition:
- Removal of existing tiles
- Removal of current fixtures (sink, bathtub, etc.)
Plumbing: Speed Fit and Solvent Weld
- Re-plumbing of the waste pipe where necessary to allow for the new layout. As low as possible.
- Re-plumbing of the hot and cold water to allow for the new layout.
Carpentry & Drylining:
- Install floorboards to allow tiling.
- Replacing all damaged plasterboards.
- Re-doing the box for the toilet and shower tray as low as possible.
- Creation of a new ceiling at lower level.
Electrical:
- Wiring of new ceiling lights downlights.
- Wiring of the new led mirror cabinet.
Tiling:
- Tiling of the walls and floor as per 3D design
Waterproofing:
- Sealing joints and angles.
- Full waterproofing with tanking kit around the shower area.
Fixtures:
- Installation of a new wall-mounted vanity unit with basin and a tap. 600mm
- Installation of a new offset shower tray 1200 x 800 and enclosure.
- Installation of a new shower mixer.
- Installation of a new standard toilet and a cistern.
Skimming & Painting:
- Anti-mould, waterproof paint on ceiling and walls.
Total Labour Price: £6000
2. Labour Materials (Estimate)
Includes plasterboards, adhesives, grout, fixings, plywood, levelling compound, waterproofing materials, etc.
Receipts will be collected and shared at the end of the project for reimbursement.
asdasd
Total Labour Price: 800
3. Tiling Area / Tiles Needed
- Wall Tiling Needed: 19 m2.
- Floor Tiling Needed: 4.5 m².
*As per customer-selected tiles and 3D design layout. *
asasd11
Tiles Price: 1000
4. Fixtures and Fittings
Fixtures and fittings to be supplied by the customer as requested.
Our Proposal: LINK - £1,665.15
Trade Price: 1800
5. Rubbish Collection (Estimate)
All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.
Estimated Price: 200
Overall Estimate
Labour Work: £6000
Building Materials: 800
Tiles Price: 1000
Fixtures and Fittings: 1800
Rubbish Collection: 200
TOTAL ESTIMATED PRICE: £9800