Bathroom Renovation Quote

Customer Name: Jack Duberley

Project Address: Flat 10, Pilgrim House, Tabard Street, SE1 4UP

Quote Date: Tue Jan 06 2026 20:06:09 GMT+0000 (Coordinated Universal Time)

Quote Reference: 44

1. Labour Work

This section outlines all labour included in your bathroom renovation.
It covers demolition, plumbing alterations, carpentry, electrics, waterproofing, tiling, installation of fixtures, and final finishing works.

 

Demolition:
- Removal of existing tiles
- Removal of current fixtures (sink, bathtub, etc.)

 

Plumbing: Speed Fit and Solvent Weld
- Re-plumbing of the waste pipe where necessary to allow for the new layout. - Re-plumbing of the hot and cold water to allow for the new layout.

- Re-plumbing of the radiator pipes to allow for the new layout.

 

Carpentry & Drylining:

- Replacing all damaged plasterboards.

- Bulding of a new box to allow for the wall-hung toilet.

- Building of a new ceiling at lower level.

- Concealeing a new cabinet above the toilet.

Electrical:

- Wiring of new ceiling lights downlights x 4.

- Wiring of the new led mirror.

- Replacement of the extractor fan.

 

Tiling: - Tiling of the walls as per 3D design.

We do not tile the floor.

 

Waterproofing:
- Sealing joints and angles.
- Full waterproofing with tanking kit around the shower area.

 

Fixtures:

- Installation of a new wall-mounted vanity unit with basin and a tap.

- Installation of a new shower tray (1200mm x 800mm) and screen (700mm) .

- Installation of a new wall mounted shower mixer kit.

- Installation of a new wall-hung toilet and a cistern.

 

Skimming & Painting:

- Anti-mould, waterproof paint on ceiling and walls.

- Skimming on all wall without tiles.

Total Labour Price: £7600

2. Labour Materials (Estimate)

This section covers materials required to carry out the labour, such as:
plasterboards, fixings, adhesives, grout, levelling compound, waterproofing materials, plywood, sealants, and similar consumables.

 

These materials are purchased as needed during the project to ensure correct installation and quality.

All receipts will be collected and shared at the end of the project, and the final amount will be adjusted based on actual cost.

 

This is an estimate, and you only pay for what is used.

Estimated Price: £1000

3. Tiling Area / Tiles Needed

We have calculated the total tiling area required for your bathroom based on measurements and the agreed 3D design.

Wall tiling required: 11 m²
Floor tiling required: 3 m²

You can copy and paste these measurements directly into any tile supplier’s website (for example: Topps Tiles or your preferred retailer) to calculate how many boxes you need.

 

💡 We have a 10% discount available with Topps Tiles, which you are welcome to use.

Tiles Price: N/A - To Be Chosen

4. Fixtures and Fittings

To make this easier, we have prepared a recommended basket that matches your design and layout.

 

You can either:

• Open the link and order directly

• Or enter the provided basket code on the Victorian Plumbing website.

 

You are free to choose alternative products if you wish - just ensure dimensions and compatibility match the design.

 

Our Proposal:

Victorian Plumbing Basket: https://www.victorianplumbing.co.uk/basket?retrievalCode=P2EGP

Trade Price: £1910.30

5. Rubbish Collection (Estimate)

All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.

Estimated Price: £200

Overall Estimate - Highly Discounted

Labour Work: £7600

Building Materials: £1000

Tiles Price: N/A - To Be Chosen

Fixtures and Fittings: £1910.30

Rubbish Collection: £200

TOTAL ESTIMATED PRICE: £10710.3

Warranty & Payment Terms

  • 2-year warranty on all labour work.
  • Payments accepted via card, transfer, or cash.

 

Our Standard Payment Structure:
(Based on the Labour Work Price).

Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.

Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.

Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.

Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.

 

The Payment Structure is based on the Labour Work Price.

 

Prepared by: Ivan Georgiev
Position: Project Manager
Step-Ahead Renovations & Designs