Bathroom Renovation Quote

Customer Name:

Project Address:

Quote Date: Thu Jan 08 2026 14:00:17 GMT+0000 (Coordinated Universal Time)

Quote Reference: 45

1. Labour Work

This section outlines all labour included in your bathroom renovation.
It covers demolition, plumbing alterations, carpentry, electrics, waterproofing, tiling, installation of fixtures, and final finishing works.

 

Demolition:
- Removal of existing tiles
- Removal of current fixtures (sink, toilet, etc.)

 

Plumbing: Speed Fit and Solvent Weld
- Re-plumbing of the waste pipe where necessary to allow for the new layout. - Re-plumbing of the hot and cold water to allow for the new layout.

- Re-plumbing of the radiator pipes to allow for the new layout.

 

Carpentry & Drylining:
- Bulding of a new plaster wall to allow for the wall-hung toilet.

- Plastering all walls to allow for the new tiles.

 

Electrical:

- Re-doing of all conduits and electircals.

 

Tiling:
- Tiling of the walls and floor as per 3D design.


Waterproofing:
- Sealing joints and angles.
- Full waterproofing with tanking kit around the shower area.

 

Fixtures:

- Installation of a new wall-mounted basin, waste trap and a tap. 440x270mm

- Installation of a new wall-hung toilet and a cistern.

- Installation of all additional items such as handles, dispencers and hand dryinng machine.

- Installation of a mirror.

 

Skimming & Painting:

- Anti-mould, waterproof paint on ceiling and walls.

Total Labour Price:

2. Labour Materials (Estimate)

This section covers materials required to carry out the labour, such as:
plasterboards, fixings, adhesives, grout, levelling compound, waterproofing materials, plywood, sealants, and similar consumables.

 

These materials are purchased as needed during the project to ensure correct installation and quality.

All receipts will be collected and shared at the end of the project, and the final amount will be adjusted based on actual cost.

 

This is an estimate, and you only pay for what is used.

Estimated Price:

3. Tiling Area / Tiles Needed

We have calculated the total tiling area required for your bathroom based on measurements and the agreed 3D design.

Wall tiling required: 26 m² £598
Floor tiling required: 5 m² £115

 

Tiles Price:

4. Fixtures and Fittings

To make this easier, we have prepared a recommended basket that matches your design and layout.

 

You can either:

• Open the link and order directly

• Or enter the provided basket code on the Victorian Plumbing website.

 

You are free to choose alternative products if you wish - just ensure dimensions and compatibility match the design.

 

Our Proposal:

Victorian Plumbing Basket: https://www.victorianplumbing.co.uk/basket?retrievalCode=FAWQB

Trade Price:

5. Rubbish Collection (Estimate)

All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.

Estimated Price:

Overall Estimate - Highly Discounted

Labour Work:

Building Materials:

Tiles Price:

Fixtures and Fittings:

Rubbish Collection:

TOTAL ESTIMATED PRICE: £0

Warranty & Payment Terms

  • 2-year warranty on all labour work.
  • Payments accepted via card, transfer, or cash.

 

Our Standard Payment Structure:
(Based on the Labour Work Price).

Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.

Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.

Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.

Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.

 

The Payment Structure is based on the Labour Work Price.

 

Prepared by: Ivan Georgiev
Position: Project Manager
Step-Ahead Renovations & Designs