top of page
brandmark-design (4).png
brandmark-design (4).png

Bathroom Renovation Quote

Customer Name: Pashalis Patsianis

Project Address: Flat 74, Crandley Court, Rainsborough Avenue, Deptford, London, SE8 5SA

Quote Date: Fri Dec 26 2025 23:01:53 GMT+0000 (Coordinated Universal Time)

Quote Reference: 38

1. Labour Work

This section outlines all labour included in your bathroom renovation. It covers demolition, plumbing alterations, carpentry, electrics, waterproofing, tiling, installation of fixtures, and final finishing works.

 

Demolition:
- Removal of existing tiles
- Removal of current fixtures (sink, bathtub, etc.)

- Removal of the existing door.

Plumbing: Speed Fit and Solvent Weld
- Re-plumbing of the waste pipe where necessary to allow for the new layout. - Re-plumbing of the hot and cold water to allow for the new layout.

- Re-plumbing of the radiator pipes to allow for the new layout.

Carpentry & Drylining:
- Install floorboards to allow tiling.

- Replacing all damaged plasterboards.

- Bulding of a new box to allow for the wall-hung toilet and shower.

- Installation of a new bi-fold door.

 


Electrical:

- Wiring of a new extractor fan.

- Re-wiring of all cables to be concealed.

Tiling:

- Tiling of the walls and floor as per 3D design

Waterproofing:
- Sealing joints and angles.
- Full waterproofing with tanking kit around the shower area.

Fixtures:

- Installation of a new wall-mounted vanity unit with basin and a tap. 600mm

- Installation of a new shower tray and enclosure.

- Installation of a new shower mixer.

- Installation of a new toilet and a cistern.

- Installation of a new extractor fan.

- Installation of a new towel rail.

Skimming & Painting:

- Skimming of the ceiling.

- Anti-mould, waterproof paint on ceiling and walls.

Total Labour Price: £7500

2. Labour Materials (Estimate)

Includes plasterboards, adhesives, grout, fixings, plywood, levelling compound, waterproofing materials, etc.

Receipts will be collected and shared at the end of the project for reimbursement. 

Estimated Price: £800

3. Tiling Area / Tiles Needed

We have calculated the total tiling area required for your bathroom based on measurements and the agreed 3D design.

Wall tiling required: 19 m²
Floor tiling required: 4.5 m²

 

You can copy and paste these measurements directly into any tile supplier’s website (for example: Topps Tiles or your preferred retailer) to calculate how many boxes you need.

 

💡 We have a 10% discount available with Topps Tiles, which you are welcome to use

Tiles Price:

4. Fixtures and Fittings

To make this easier, we have prepared a recommended basket that matches your design and layout.

 

You can either:
• Open the link and order directly
• Or enter the provided basket code on the Victorian Plumbing website.

 

You are free to choose alternative products if you wish - just ensure dimensions and compatibility match the design.

 

Our Proposal:

Victorian Plumbing Basket: https://www.victorianplumbing.co.uk/basket?retrievalCode=8VDDX

 

Trade Price: £1,768.60

5. Rubbish Collection (Estimate)

All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.

Estimated Price: £200

Overall Estimate - Highly Discounted

Labour Work: £7500

Building Materials: £800

Tiles Price:

Fixtures and Fittings: £1,768.60

Rubbish Collection: £200

TOTAL ESTIMATED PRICE: £10268.6

Warranty & Payment Terms

  • 2-year warranty on all labour work.
  • Payments accepted via card, transfer, or cash.

 

Our Standard Payment Structure:
(Based on the Labour Work Price).

Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.

Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.

Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.

Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.

 

The Payment Structure is based on the Labour Work Price.

 

Prepared by: Ivan Georgiev
Position: Project Manager
Step-Ahead Renovations & Designs

bottom of page