Bathroom Renovation Quote
Customer Name: Stuart Mckeown
Project Address: Flat 18 Verona Court, 5 Myers Lane, SE14 5RX
Quote Date: Tue Dec 09 2025 22:21:37 GMT+0000 (Coordinated Universal Time)
Quote Reference: 24
1. Labour Work
Demolition:
- Removal of existing tiles
- Removal of current fixtures (sink, bathtub, etc.)
Plumbing: Speed Fit and Solvent Weld
- Re-plumbing of the waste pipe where necessary to allow for the new layout. - Re-plumbing of the hot and cold water to allow for the new layout.
- Re-plumbing of the radiator pipes to allow for the new layout.
Carpentry & Drylining:
- Install floorboards to allow tiling.
- Replacing all damaged plasterboards.
- Bulding of a new box to allow for the wall-hung toilet.
Electrical:
- Re-placement of the ceiling lights.
- Wiring of a new extractor fan.
Tiling:
- Tiling of the walls and floor as per 3D design
Waterproofing:
- Sealing joints and angles.
- Full waterproofing with tanking kit around the shower area.
Fixtures:
- Installation of a new wall-mounted vanity unit with basin and a tap. 600mm
- Installation of a new bathtub and screen.
- Installation of a new electric shower mixer.
- Installation of a new wall-hung toilet and a cistern.
- Installation of a new extractor fan.
- Installation of a new mirror cabinet.
Skimming & Painting:
- Anti-mould, waterproof paint on ceiling and walls.
Total Labour Price: £5600
2. Labour Materials (Estimate)
Includes plasterboards, adhesives, grout, fixings, plywood, levelling compound, waterproofing materials, etc.
Receipts will be collected and shared at the end of the project for reimbursement.
Estimated Price: £700
3. Tiling Area / Tiles Needed
- Wall Tiling Needed: 22 m2.
- Floor Tiling Needed: 4.5 m².
*As per customer-selected tiles and 3D design layout. *
Tiles Price: N/A - To be selected by customer.
4. Fixtures and Fittings
Fixtures and fittings to be supplied by the customer as requested.
Our Proposal:
Victorian Plumbing Basket: LINK
Victorian Plumbing Basket Code: VNBJ2
Trade Price: £1,763.10
5. Rubbish Collection (Estimate)
All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.
Estimated Price: £200
Overall Estimate - Highly Discounted
Labour Work: £5600
Building Materials: £700
Tiles Price: N/A - To be selected by customer.
Fixtures and Fittings: £1,763.10
Rubbish Collection: £200
TOTAL ESTIMATED PRICE: £8263.1
Warranty & Payment Terms
- 2-year warranty on all labour work.
- Payments accepted via card, transfer, or cash.
Our Standard Payment Structure:
(Based on the Labour Work Price).
Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.
Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.
Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.
Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.
The Payment Structure is based on the Labour Work Price.
Prepared by: Ivan Georgiev
Position: Project Manager
Step-Ahead Renovations & Designs