top of page
brandmark-design (4).png
brandmark-design (4).png

Living Room Cupboard Adjusment

Customer Name: Sebastian Heckmeier

Project Address: 1c Orleston Road, N78LH

Quote Date: Thu Dec 04 2025 21:34:14 GMT+0000 (Coordinated Universal Time)

Quote Reference: 16

1. Labour Work

Demolition:
- Removal of existing Cupboard.

Carpentry & Drylining:

- Replacing all plasterboards.

- Encasing the beam making it even.

- Making good on other walls due to damages.

Electrical:

- Re-wiring of the light switch and ceiling lights.

Flooring:

- Installation of a laminate flooring same/similar to the old one

Skimming:

- Skimming of the ceiling and walls externally and internally to allow for painting.

Total Labour Price: £6000

2. Labour Materials (Estimate)

Includes plasterboards, adhesives, grout, fixings, plywood, levelling compound, waterproofing materials, etc.

Receipts will be collected and shared at the end of the project for reimbursement.

Estimated Price: £600

3. Tiling Area / Tiles Needed

N/A

Tiles Price: N/A

4. Fixtures and Fittings

N/A

Trade Price: N/A

5. Rubbish Collection (Estimate)

All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.

Estimated Price: £200

Overall Estimate - Highly Discounted

Labour Work: £6000

Building Materials: £600

Tiles Price: N/A

Fixtures and Fittings: N/A

Rubbish Collection: £200

TOTAL ESTIMATED PRICE: £6800

Warranty & Payment Terms

  • 2-year warranty on all labour work.
  • Payments accepted via card, transfer, or cash.

 

Our Standard Payment Structure:
(Based on the Labour Work Price).

Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.

Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.

Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.

Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.

 

The Payment Structure is based on the Labour Work Price.

 

Prepared by: Ivan Georgiev
Position: Project Manager
Step-Ahead Renovations & Designs

bottom of page