Bathroom Renovation Quote
Customer Name: 3333
Project Address: 123123
Quote Date: Sat Dec 06 2025 01:11:50 GMT+0000 (Coordinated Universal Time)
Quote Reference: 18
1. Labour Work
Demolition:
- Removal of existing tiles
- Removal of current fixtures (sink, bathtub, etc.)
Plumbing: Speed Fit and Solvent Weld
- Re-plumbing of the waste pipe where necessary to allow for the new layout. As low as possible.
- Re-plumbing of the hot and cold water to allow for the new layout.
Carpentry & Drylining:
- Install floorboards to allow tiling.
- Replacing all damaged plasterboards.
- Re-doing the box for the toilet and shower tray as low as possible.
- Creation of a new ceiling at lower level.
Electrical:
- Wiring of new ceiling lights downlights.
- Wiring of the new led mirror cabinet.
Tiling:
- Tiling of the walls and floor as per 3D design
Waterproofing:
- Sealing joints and angles.
- Full waterproofing with tanking kit around the shower area.
Fixtures:
- Installation of a new wall-mounted vanity unit with basin and a tap. 600mm
- Installation of a new offset shower tray 1200 x 800 and enclosure.
- Installation of a new shower mixer.
- Installation of a new standard toilet and a cistern.
Skimming & Painting:
- Anti-mould, waterproof paint on ceiling and walls.
Total Labour Price:
2. Labour Materials (Estimate)
Includes plasterboards, adhesives, grout, fixings, plywood, levelling compound, waterproofing materials, etc.
Receipts will be collected and shared at the end of the project for reimbursement.
Estimated Price:
3. Tiling Area / Tiles Needed
- Wall Tiling Needed: 19 m2.
- Floor Tiling Needed: 4.5 m².
*As per customer-selected tiles and 3D design layout. *
Tiles Price:
4. Fixtures and Fittings
Fixtures and fittings to be supplied by the customer as requested.
Our Proposal: LINK - £1,665.15
Trade Price:
5. Rubbish Collection (Estimate)
All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.
Estimated Price:
Overall Estimate - Highly Discounted
Labour Work:
Building Materials:
Tiles Price:
Fixtures and Fittings:
Rubbish Collection:
TOTAL ESTIMATED PRICE: £0
Warranty & Payment Terms
- 2-year warranty on all labour work.
- Payments accepted via card, transfer, or cash.
Our Standard Payment Structure:
(Based on the Labour Work Price).
Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.
Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.
Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.
Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.
The Payment Structure is based on the Labour Work Price.
Prepared by: Ivan Georgiev
Position: Project Manager
Step-Ahead Renovations & Designs