top of page
brandmark-design (4).png
brandmark-design (4).png

Bathroom Renovation Quote

Customer Name: 3333

Project Address: 123123

Quote Date: Sat Dec 06 2025 01:11:50 GMT+0000 (Coordinated Universal Time)

Quote Reference: 18

1. Labour Work

Demolition:
- Removal of existing tiles
- Removal of current fixtures (sink, bathtub, etc.)

Plumbing: Speed Fit and Solvent Weld
- Re-plumbing of the waste pipe where necessary to allow for the new layout. As low as possible.

- Re-plumbing of the hot and cold water to allow for the new layout.

Carpentry & Drylining:  
- Install floorboards to allow tiling.

- Replacing all damaged plasterboards.

- Re-doing the box for the toilet and shower tray as low as possible.

- Creation of a new ceiling at lower level.

Electrical:

- Wiring of new ceiling lights downlights.

- Wiring of the new led mirror cabinet.

Tiling:
- Tiling of the walls and floor as per 3D design


Waterproofing:
- Sealing joints and angles.
- Full waterproofing with tanking kit around the shower area.

Fixtures:

- Installation of a new wall-mounted vanity unit with basin and a tap. 600mm

- Installation of a new offset shower tray 1200 x 800 and enclosure.

- Installation of a new shower mixer.

- Installation of a new standard toilet and a cistern.

Skimming & Painting:

- Anti-mould, waterproof paint on ceiling and walls.

Total Labour Price:

2. Labour Materials (Estimate)

Includes plasterboards, adhesives, grout, fixings, plywood, levelling compound, waterproofing materials, etc.

Receipts will be collected and shared at the end of the project for reimbursement. 

Estimated Price:

3. Tiling Area / Tiles Needed

- Wall Tiling Needed: 19 m2.

- Floor Tiling Needed: 4.5 m².

*As per customer-selected tiles and 3D design layout. *

Tiles Price:

4. Fixtures and Fittings

Fixtures and fittings to be supplied by the customer as requested.

Our Proposal: LINK - £1,665.15

Trade Price:

5. Rubbish Collection (Estimate)

All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.

Estimated Price:

Overall Estimate - Highly Discounted

Labour Work:

Building Materials:

Tiles Price:

Fixtures and Fittings:

Rubbish Collection:

TOTAL ESTIMATED PRICE: £0

Warranty & Payment Terms

  • 2-year warranty on all labour work.
  • Payments accepted via card, transfer, or cash.

 

Our Standard Payment Structure:
(Based on the Labour Work Price).

Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.

Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.

Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.

Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.

 

The Payment Structure is based on the Labour Work Price.

 

Prepared by: Ivan Georgiev
Position: Project Manager
Step-Ahead Renovations & Designs

bottom of page