top of page
brandmark-design (4).png
brandmark-design (4).png

Bathroom Renovation Quote

Customer Name: Sebastian Heckmeier

Project Address: 1c Orleston Road, N78LH

Quote Date: Thu Dec 04 2025 21:08:48 GMT+0000 (Coordinated Universal Time)

Quote Reference: 14

1. Labour Work

Demolition:
- Removal of existing tiles
- Removal of current fixtures (sink, bathtub, etc.)

Plumbing: Speed Fit and Solvent Weld
- Re-plumbing of the waste pipe where necessary to allow for the new vanity unit and shower.

- Re-plumbing of the hot and cold water to allow for the new vanity unit.

Carpentry & Drylining:
- Re-plastering all walls, floor and ceiling to allow for smooth surface and microcement installation.

- Covering the bathroom MDF shelves in microcement.

Electrical:

- Wiring of a new extractor fan.

Microcement:
- Application of a microcement on the floor, walls and ceiling.


Waterproofing:
- Sealing joints and angles.
- Full waterproofing with tanking kit around the shower area.

Fixtures:

- Installation of a new wall-mounted vanity unit with basin and a tap. 600mm

- Installation of the same bathtub and new screen.

- Installation of a new shower mixer.

- Installation of a new bath filler.

- Installation of a new standard toilet and a cistern.

Skimming:

- Skimming of all walls after the plastering to allow for smooth finish.

Total Labour Price: £8500

2. Labour Materials (Estimate)

Includes plasterboards, adhesives, grout, fixings, plywood, levelling compound, waterproofing materials, etc.

Receipts will be collected and shared at the end of the project for reimbursement. 

Estimated Price: £1100

3. Tiling Area / Tiles Needed

- Microcement Area (inc. Floor and Ceiling): 29 m2.

 

*As per customer-selected tiles and 3D design layout. *

Tiles Price: N/A - Micro cement

4. Fixtures and Fittings

Fixtures and fittings to be supplied by the customer as requested.

Our Selected Items:

Victorian Plumbing Basket Link: LINK

Victorian Plumbing Basket Code: VG7T2

Trade Price: £1,374.35

5. Rubbish Collection (Estimate)

All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.

Estimated Price: £200

Overall Estimate - Highly Discounted

Labour Work: £8500

Building Materials: £1100

Tiles Price: N/A - Micro cement

Fixtures and Fittings: £1,374.35

Rubbish Collection: £200

TOTAL ESTIMATED PRICE: £11174.35

Warranty & Payment Terms

  • 2-year warranty on all labour work.
  • Payments accepted via card, transfer, or cash.

 

Our Standard Payment Structure:
(Based on the Labour Work Price).

Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.

Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.

Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.

Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.

 

The Payment Structure is based on the Labour Work Price.

 

Prepared by: Ivan Georgiev
Position: Project Manager
Step-Ahead Renovations & Designs

bottom of page