1. Labour Work

Demolition:
- Removal of existing tiles
- Removal of current fixtures (sink, bathtub, etc.)

Plumbing: Speed Fit and Solvent Weld
- Re-plumbing of the waste pipe where necessary to allow for the new layout. - Re-plumbing of the hot and cold water to allow for the new layout.

- Re-plumbing of the radiator pipes to allow for the new layout.

Carpentry & Drylining:
- Install floorboards to allow tiling.

- Bulding of a new box to allow for the wall-hung toilet.

Electrical:

- Wiring of new ceiling lights light.

- Wiring of the light switch outside the bathroom

Tiling:
- Tiling of the walls and floor as per 3D design.

Waterproofing:
- Sealing joints and angles.
- Full waterproofing with tanking kit around the shower area.

Fixtures:

- Installation of a new wall-mounted vanity unit with basin and a tap. 600mm

- Installation of a new wetroom tray and screen.

- Installation of a new shower mixer.

- Installation of a new Concealed toilet and a cistern.

Skimming & Painting:

- Anti-mould, waterproof paint on ceiling and walls.

Total Labour Price: £6000

2. Labour Materials (Estimate)

Includes plasterboards, adhesives, grout, fixings, plywood, levelling compound, waterproofing materials, etc.

Receipts will be collected and shared at the end of the project for reimbursement. 

Estimated Price: £800

3. Tiling Area / Tiles Needed

We have calculated the total tiling area required for your bathroom based on measurements and the agreed 3D design.

Wall tiling required: 13 m²
Floor tiling required: 5.5 m²

You can copy and paste these measurements directly into any tile supplier’s website (for example: Topps Tiles or your preferred retailer) to calculate how many boxes you need and now much it will cost.

💡 We have a 10% discount available with Topps Tiles, which you are welcome to use.

Tiles Price: To be selected by customer.

4. Fixtures and Fittings

To make this easier, we have prepared a recommended basket that matches your design and layout.

You can either:

• Open the link and order directly

• Or enter the provided basket code on the Victorian Plumbing website.

You are free to choose alternative products if you wish - just ensure dimensions and compatibility match the design.

Our Proposal:

Victorian Plumbing Basket: https://www.victorianplumbing.co.uk/basket?retrievalCode=CE73M

Trade Price: £1575.30

5. Rubbish Collection (Estimate)

All waste will be stored safely until the end of the project. A quote will be obtained based on a picture and shared for approval prior to disposal.

Estimated Price: £200

Overall Estimate - Highly Discounted

Labour Work: £6000

Building Materials: £800

Tiles Price: To be selected by customer.

Fixtures and Fittings: £1575.30

Rubbish Collection: £200

TOTAL ESTIMATED PRICE: £8575.3

Warranty & Payment Terms

  • 2-year warranty on all labour work.
  • Payments accepted via card, transfer, or cash.

 

Our Standard Payment Structure:
(Based on the Labour Work Price).

Commitment Payment – 30%:
This payment secures your project date and enables us to assist further with fixture selection, ordering, etc.

Milestone 1 – 30%:
Due upon completion of plumbing, plastering, and waterproofing, with walls prepared for tiling.

Milestone 2 – 30%:
Due upon completion of tiling and installation of the bathtub/shower tray.

Upon Customer Approval – 10%:
Due once you are satisfied with the work and snagging issues are resolved.

 

The Payment Structure is based on the Labour Work Price.

 